3rd Eclipse International Development Day
MOTION will be hosting the 3rd Eclipse International Development Day on May 30 at the Fraunhofer-Forum in Berlin. Learn more in our Wiki.
George Din
Fraunhofer FOKUS
Kaiserin-Augusta-Allee 31
D 10589 Berlin
Tel.: +49 (0)30 3463 7101
Fax.: +49 (0)30 3463 8000
george
[dot] din [at] fokus [dot] fraunhofer [dot] de
The TBL project has the goal of realizing a test system capable of testing the performance indicators of network elements during their operation. The Test System verifies the performance parameters by sending a huge number of requests in a short period of time. It is designed for testing in special the UMTS, GPRS, GSM, SS7 and ISDN (PRI and BRA) connections. The performance test suites are written in TTCN-3; for the execution of the test campains we use the TTman platform developed by Fraunhofer FOKUS and Testing Technologies.
It is the aim of this project to design, implement and apply a TTCN-3 based load test system for various network elements in UMTS, GPRS, GSM, SS7 and ISDN.
In TBL key roles are assigned to international standards by ETSI:
There are high requirements on efficient and flexible load tests. They have to fullfil very high request rates and need to be executed time synchronized during the test campaign execution.
| back top |
3rd Eclipse International Development Day
MOTION will be hosting the 3rd Eclipse International Development Day on May 30 at the Fraunhofer-Forum in Berlin. Learn more in our Wiki.
George Din
Fraunhofer FOKUS
Kaiserin-Augusta-Allee 31
D 10589 Berlin
Tel.: +49 (0)30 3463 7101
Fax.: +49 (0)30 3463 8000
george
[dot] din [at] fokus [dot] fraunhofer [dot] de